Location : BorKeo Province
Construction Cost: USD 44,815,322.13
Length of bridge: 630 Km
Width: 14.7 m
Funded by: Chinese and Thai Governments.
Consultant: LTEC,AEC,FZEC
Lead Firm: AEC
Country: Lao PDR
Client: MPWT
Construction Supervision Period : April. 2010 - July. 2013
Construction supervision of MeKong River Bridge as prestressed concrete box girder 630 m in total, Road between R3 ( in Lao PDR side) and Highway No.1020 ( in Thailand side), 11.6 Km long with Asphaltic Concrete Wearing and Binder Course 10 cm thick and roadway 12.00 m wide, Border Control Facilities ( in Thailand and Lao PDR sides), Traffic Changeover, 1 No ( in Thailand side ) . (1) work plan and contract performance control; (2) Quality Control; (3) Quantities Inspection for this project. LTEC has 9 technical staffs,totally 248 man-months.